The most expensive pre-listing mistake we see: sellers who come to us 7 days before listing in full panic mode. At that point we end up cutting corners that cost them at sale — or doing rushed work that doesn’t hold up to the inspection. Sellers who come 60-90 days out get a different outcome: sequenced repairs, no specialty-trade delays, and a home that shows like new.

Here’s the ideal day-by-day cadence we recommend for Wasatch Front sellers.

90 days out — strategy and planning

  • Walk the home with your agent. Make a written punch list of every visible flaw and dated element.
  • Decide your repair budget. 1-3% of expected sale price.
  • Get a pre-listing inspection if you want to remove surprises ($400-$700 — optional but powerful).
  • Get bids on the bigger items (deck refresh, multi-room repaint, HVAC, roof if borderline).
  • Schedule specialty trades with 2-4 week lead times.
  • Book the stager now — top Wasatch Front stagers book out 4-6 weeks.

60 days out — execute the big items

  • Complete any specialty trade work (HVAC, roof, electrical, plumbing outside handyman scope)
  • Complete deck refresh (sand + stain takes 3-5 days plus drying)
  • Complete full-room repaints
  • Start exterior pressure wash, gutter cleaning, landscaping touch-ups
  • Order specialty fixtures or hardware so they’re on hand

30 days out — cosmetic sweep

14 days out — staging and final polish

  • Stage the home
  • Professional listing photography (after staging)
  • Drone exterior photos if warranted
  • Final walkthrough with your agent
  • MLS goes live

If you only have 14 days

Triage: skip specialty trades, full repaints, deck refresh. Focus on drywall patches + paint touch-ups, GFCIs + detectors, caulking refresh, 3 highest-impact light fixture swaps, kitchen hardware swap, deep clean, pressure wash exterior. Stage what you can. Accept slight market-time penalty.

If you have 90+ days but no time to coordinate yourself

That’s exactly what GoMarketReady was built for. We handle the full walkthrough, sequencing, and execution. One bid, one project manager, pay-at-settlement option.

📥 Free PDF — The Utah Home Seller’s Pre-Listing Guide

This article expands on one section of a longer 19-page playbook. The full guide also covers the 12 highest-ROI updates, Wasatch Front-specific issues, FHA/VA inspection killers, and the 30/60/90-day timeline.

Download the Free Guide (PDF) →

Want help running the list?

Our GoMarketReady pre-listing program coordinates the whole punch list — handyman scope directly, licensed-trade scope through our trade partners. One walkthrough, one bid, one project manager. Pay-at-settlement available through your title company.

Call (801) 895-2084 for a free pre-listing walkthrough.



Author: Kris Bowen

Kris Bowen is the owner of Handyman Jacks. After two decades working in Utah residential real estate, he started HMJ to bring contractor-grade execution to the pre-listing repair work that often determines whether a Wasatch Front home sells fast or sits.

Leave a Reply

Your email address will not be published.

You may use these <abbr title="HyperText Markup Language">HTML</abbr> tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

*

★★★★★
Loading review...
— Customer
Read all reviews →

Before you go — want a starting price?

Send a photo or describe your project. We will reply with a starting range within hours. No sales call. No pressure. Free.

Licensed Utah General Contractor #14195166-5501. Fully insured. 1-year labor warranty. Background-checked techs.

📞 Call 💬 Text 📸 Photo Estimate